翻訳と辞書 |
Metropolitan Atlanta Rapid Transit Authority : ウィキペディア英語版 | Metropolitan Atlanta Rapid Transit Authority
The Metropolitan Atlanta Rapid Transit Authority or MARTA is the principal rapid-transit system in the Atlanta metropolitan area. It is the eighth-largest rapid transit system in the United States by ridership. Formed in 1971 as strictly a bus system, MARTA operates a network of bus routes linked to a rapid transit system consisting of of rail track with 38 train stations. MARTA operates almost exclusively in Fulton, Clayton and DeKalb counties, with bus service to two destinations in Cobb County (Six Flags Over Georgia and the Cumberland Transfer Center next to the Cumberland Mall) and a single rail station in Clayton County at Hartsfield-Jackson Atlanta International Airport. MARTA also operates a separate paratransit service for disabled customers. , the average total daily ridership for the system (bus and rail) was 438,900 passengers. ==History== (詳細はDeKalb, Fulton, Clayton, Gwinnett, and Cobb counties. These were the five original counties in the Atlanta metropolitan area, and to this day are the five largest counties in the region. MARTA was formed by an act of the Georgia General Assembly in 1965. In the same year, four of the five metropolitan area counties (Clayton, DeKalb, Fulton, and Gwinnett) and the City of Atlanta passed a referendum authorizing participation in the system, but the referendum failed in Cobb County. Although a 1968 referendum to fund MARTA failed, in 1971, voters in Fulton and DeKalb counties successfully passed a 1% sales tax increase to pay for MARTA operations, while Clayton and Gwinnett counties overwhelmingly rejected the tax in the referendum, fearing the introduction of crime and "undesirable elements". Gwinnett County remains outside of the MARTA system, but in November 2014, Clayton County voters passed a 1% sales tax to join the MARTA system, reversing its decision in 1971. In 1971, the agency agreed to purchase the existing, bus-only Atlanta Transit Company; the sale of the company closed on February 17, 1972, giving the agency control over all public transit in the immediate Atlanta area. Construction began on MARTA's heavy rail system in 1975, with the first rail service commencing on June 30, 1979.〔 The system has since built most of the proposed rail lines, as well as stations in Dunwoody, Sandy Springs, and North Springs which were not included in the original plan. The missing rail segments from the original plan include a Tucker-North DeKalb line with service to Emory University and North Druid Hills, a Northwest line with service to Brookwood and Northside Drive, extension of the West line to Brownlee-Boulder Park near Fairburn Road, extension of the Proctor Creek line to West Highlands, and a branch off the south line to Hapeville and Clayton County.
抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「Metropolitan Atlanta Rapid Transit Authority」の詳細全文を読む
スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース |
Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.
|
|